Installation
Instructions
Domed Ceilings and
Barrel Vaults
USG Drywall Suspension System
These installation instructions are divided into two parts: Part 1 applies to domed ceilings, and Part 2 applies
to vaulted ceilings. Note: For installation instructions for vaulted ceilings with domed ends, follow Part I for
domed ceilings to build the ends first.
To ensure proper installation, read all instructions before you begin. Check the enclosed Bill of Materials to
be sure that all parts and equipment are present and undamaged. Note: Parts will be permanently damaged if
installed incorrectly.
To generate a set of construction specifications on-line, go to www.usg.com > Resources > Online Tools.
Parts
Construction specifications (supplied separately) Bill of materials (BOM)
Custom curved tees
DGHUB Dome hub (if specified on BOM) DGSP180 Main tee splice plates (if specified on BOM)
DGLW Cross tees (if specified on BOM) DGWC24 Wall attachment clips (if specified on BOM)
Supplies
Hanger wire Self-drilling screws
Tools
In addition to standard 16 to 32 spring clamps Locking “C” clamp
grid installation tools,
you should have:
Technical Service 800 USG.4YOU
Samples, Literature 888 874.2450
Customer Service 800 950.3839
usg.com
12-ga. galvanized steel wire in
straight lengths
#2 Philips round washer-
head or similar
Vedere la pagina 0
1 2 3 4 5 6 ... 11 12

Sommario

Pagina 1 - Barrel Vaults

Page 1 of 12Installation Instructions Domed Ceilings and Barrel VaultsUSG Drywall Suspension System These installation instructions are divided i

Pagina 2 - Instructions

Page 10 of 12Step 3 Install main tee ribs The construction specifications indicate the total arc length required for each main-tee rib (dimension G

Pagina 3

Page 11 of 12Part 2:Installation Instructions Barrel VaultsStep 5 Cut and terminate For perimeter cuts, cut in and terminate cross tees at both end

Pagina 4

Product InformationSee usg.com for the most up-to-date product information. NoteAll products described here may not be available in all geographic m

Pagina 5

Page 2 of 12Part 1: Installation Instructions DomesStep 1 Gather construction Dome construction specifications are prepared specifically for each

Pagina 6

Page 3 of 12Part 1: Installation Instructions Domes Tip: It may be easier to mark hanger locations on a tape measure or a long stick and use this

Pagina 7

Page 4 of 12Part 1: Installation Instructions DomesStep 4 Assemble and hang The first row in Table 1.2 of the Construction Specifications indicates

Pagina 8

Page 5 of 12Part 1: Installation Instructions DomesStep 5 Add headers to Steps 5-7 are not needed for domes smaller than 10-1/2 in diameter (dimen

Pagina 9

Page 6 of 12Part 1: Installation Instructions DomesStep 5 2. Table 1.3 of the Construction Specifications indicates the correct position of each h

Pagina 10

Page 7 of 12Part 1: Installation Instructions DomesStep 6 Install secondary Use the primary spokes as a model for hanger locations on the eight (8

Pagina 11

Page 8 of 12Part 1: Installation Instructions DomesStep 7 Install additional Additional headers and secondary spokes are generally needed for domes

Pagina 12 - Literature number AC3157

Page 9 of 12Part 2:Installation Instructions Barrel VaultsStep 1 Gather construction Vault construction specifications are prepared specifically fo